The Make-Ready Process: Complete Apartment Checklist — Tell Projects Houston

The Make-Ready Process: Complete Apartment Checklist

Step-by-step make-ready checklist for apartment unit turns. From pre-moveout inspection to final walkthrough in 3-7 days.


A fast, consistent make-ready process is the difference between 3 days of vacancy and 30. This checklist covers every step from pre-moveout inspection through final walkthrough, designed to keep Houston apartment units turning in 3-7 days without sacrificing quality.

Pre-Moveout Inspection

Schedule a walkthrough 30 days before lease end to document existing conditions. Photograph every room, appliance, and fixture. This establishes a baseline for damage assessment and gives you time to pre-order materials. In Houston, pre-inspections reduce turn time by an average of 2 days because supplies are staged in advance.

Damage Assessment and Chargebacks

Compare pre-moveout photos against move-in documentation. Texas Property Code Section 92.104 gives landlords 30 days to return the deposit with an itemized deduction list. Separate normal wear (paint fade, carpet wear paths) from tenant damage (holes, stains, broken fixtures). Clear documentation reduces deposit disputes by 60%.

Paint, Patch, and Repair Workflow

Patch drywall holes first, then sand, prime, and paint in one continuous workflow. Use the same 2-3 paint colors across all units to simplify inventory. Eggshell finish on walls (washable), semi-gloss on trim and doors (durable). In Houston's humidity, allow 4-6 hours between coats and run HVAC during painting to manage moisture.

Appliance and Fixture Check

Test every appliance: run the dishwasher through a full cycle, verify all burners ignite, check refrigerator temperature (35-38 degrees F). Replace drip pans, clean oven interiors, and verify garbage disposal operation. Swap out any fixture that shows corrosion or excessive wear — a $15 faucet aerator now prevents a $150 service call later.

Deep Cleaning and Final Walkthrough

Professional cleaning runs $150-$300 per unit and is non-negotiable for quality turns. Focus areas: inside cabinets, behind appliances, bathroom grout, window tracks, and blinds. The final walkthrough should be done by a manager — not the person who cleaned — using a 50-point checklist. Photograph the finished unit for move-in documentation.

Frequently Asked Questions

How long does the make-ready process take per unit?
A standard make-ready takes 3-7 days depending on unit condition. Express turns with pre-staged materials can be completed in 48 hours for units in good condition.
What does apartment make-ready cost per unit?
Basic make-ready runs $1,500-$3,000 per unit (paint, clean, minor repairs). Enhanced turns with new flooring and fixtures cost $3,000-$8,000. Full renovation turns start at $8,000+.
What is included in a standard make-ready?
Standard make-ready includes interior painting, deep cleaning, appliance servicing, fixture tightening, carpet cleaning or replacement, touch-up repairs, and a final quality walkthrough.
How do you ensure quality on high-volume make-readies?
We use a standardized 47-point checklist, assign dedicated quality inspectors, photograph before/after conditions, and require sign-off before returning keys to leasing.

Ready to Transform Your Property?

Get a free, no-obligation estimate. Our team responds within 24 hours.

Tell Projects Network

Free Quote Call Now